These are pictures
of a built-up roof that was replaced with an EPDM (rubber)
membrane system. We mechanically attached 2 inches of
polyisocyanurate roof insulation to provide additional "R"
value. We then fully adhered the 45-mil EPDM membrane to
the roof insulation. We completed the job with a custom
fabricated metal parapet wall cap.
These are pictures
of a deck we waterproofed with a traffic-top coating. This
is a multi-step process. First we strip-in the joints with
a waterproofing product and fiberglass mesh. Then we apply
two (2) coats of a waterproofing base coat, one (1) application
of top coat, followed by one (1) application of traffic coat.
The result is a beautiful deck that is not only waterproof, but
fully capable of withstanding heavy pedestrian traffic.
Roof
Maintenance & Restoration, Inc.
P.O. Box 1160
Rincon, GA 31326
912-826-0794 (office)
912-547-9010 (cell)
912-826-0721 (fax)
Email - info@rmrcorp.com